Home
About Us
Company Background
Professional Team
Corporate Structure
Group Organisation Chart
Clients & Strategic Partners
Our expertise
Our Projects
Gallery
Seminar
Company Events
Contact Us
Entrance Bridge over the Lake leading to Sunway Serene Condominium Development Project, Kelana Jaya, Selangor
Carried out alternative design using cast in-situ beam and slab supported on spun piles for the access bridge over the lake
Designed the short driven spun piles with toe-pin for anchoring and lateral stability
Designed the temporary steel bridge to suit the span-by-span construction method for the construction and piling load