Home
About Us
Company Background
Professional Team
Corporate Structure
Group Organisation Chart
Clients & Strategic Partners
Our expertise
Our Projects
Gallery
Seminar
Company Events
Contact Us
Bridge over Sungai Sebelak, Roban, Sarawak: Cast In-Situ Prestressed Box Girder (65/120/65m) built by Cantilever Construction with Anchor Span on Falsework
Carried out alternative design of the prestressed segmental box girder using cantilever construction method with cast in-situ anchor spans
Design of Temporary Fixity System and carry out Construction Stage Stability Analysis
Designed the falsework for the cast in-situ anchor spans and box girder stitching segment.