Home
About Us
Company Background
Professional Team
Corporate Structure
Group Organisation Chart
Clients & Strategic Partners
Our expertise
Our Projects
Gallery
Seminar
Company Events
Contact Us
Jeram Panjang Bridge, Rembau, Negeri Sembilan: Alternative Design of Pretensioned M-Beams based on the As-Built Piling Layout and Pier Position
Carried out bridge alignment design and precast beam layout to suit the as-built pier position.
Analysed and designed the pretensioned M-beams with varying length to suit the required span length based on as-built pier position.