MRT-S5 Stations: Construction Engineering and Temporary Prestress Design for Construction of Segmental Cantilever Crosshead
Alternative design on the prestress tendons for the precast segmental crosshead to comply to the required stress during stressing and segment erection.
Design the temporary prestress bar for the erection of precast segmental crosshead
Design the steel blister and holding-down system to anchor temporary prestress bars onto the precast segments during segment erection
Carried out stability analysis on station structures during construction and advised contractor on the construction sequence to ensure stability throughout the construction.
Prepared shop drawings for the precast segmental crosshead casting at yard.