MRT SBK Line Station Package S5: Temporary Work Design and Construction Engineering
Designed the temporary prestress bar, temporary steel blister, shear key, lifting frame for cantilever precast segmental crosshead construction.
Carry out value engineering and construction engineering in order to achieve optimum structure design.