MRT V201: Temporary Work Design and Construction Engineering
Design of Anchoring for Tie Down Bar for Launching Gantry on Pier & SBG.
Design check of Tie Down Bar during launching of SBG (balance cantilever method) on Long Spans.
Design check of SBG Stability, Pier Capacity, Crosshead Capacity & Portal Capacity during movement of Launching Gantry and launching works of SBG.
Design of levelling beam for Long Spans.
Design of temporary rail, trolley and crash barrier for SBG launching on Station Box & Design Check of existing structures.
Design check of pier, pile cap and pile capacity for segment launching work.
Design check and analysis for SBG tie down prestress bar.
Design of sliding beam for segment launching works.
Design the temporary prestress bar, temporary steel blister, shear key, lifting frame for cantilever precast segmental crosshead construction.