Home
About Us
Company Background
Professional Team
Corporate Structure
Group Organisation Chart
Clients & Strategic Partners
Our expertise
Our Projects
Gallery
Seminar
Company Events
Contact Us
Puteri Harbour Cable-Stayed Arch Bridge, Nusajaya, Johor: Construction Engineering Service and Bridge Stability Control during Construction
Carried out bridge stability analysis during construction and advised contractor on the complicated bridge construction sequence to ensure stability throughout the construction.
Design check on tendon and cable stressing sequence based on the construction sequence
Pre-camber design and prepared pre-camber chart for cantilever construction.