Design of temporary fixity to stablise the bridge during construction for box girder bridge supported on bearing but built with balanced cantilever construction. The bridge was designed to have segments cantilevered82m from pier during construction stage.
Carried out bridge stability check and pre-camber calculation for balanced cantilever construction.
Design temporary work to stabilise the two cantilever tips for casting of midspan and end span stitching segments.