OSD Design Group
  • Home
  • About Us
    • Company Background
    • Professional Team
    • Corporate Structure
    • Group Organisation Chart
    • Clients & Strategic Partners
  • Our expertise
  • Our Projects
  • Gallery
    • Seminar
    • Company Events
  • Contact Us
Seredeng Bridge, Sibu, Sarawak:Temporary Fixity System to Stabilise Bridge During Balanced Cantilever Construction

Seredeng Bridge, Sibu, Sarawak:Temporary Fixity System to Stabilise Bridge During Balanced Cantilever Construction

  • Design of temporary fixity to stablise the bridge during construction for box girder bridge supported on bearing but built with balanced cantilever construction. The bridge was designed to have segments cantilevered82m from pier during construction stage.
  • Carried out bridge stability check and pre-camber calculation for balanced cantilever construction.
  • Design temporary work to stabilise the two cantilever tips for casting of midspan and end span stitching segments.

Corporate Office

OSD Design Group OSD Design Group

OSD Alliance Sdn Bhd (Co. No. 1303588-V)

Lobby 2, Level 7, C713A - C718,
Centum @ Oasis Corporate Park,
No. 2, Jalan PJU 1A/2, Ara Damansara,
47301 Petaling Jaya, Selangor

T: +(603) 7610 3365
F: +(603) 7610 3367

enquiry@osdalliance.com.my

OSD Design Group Associate Companies
OSD Design Group

OSD Consultants (M) Sdn Bhd (Co. No. 814495-U)

 
 

OSD Design Group

Perunding Jambatan OSD Sdn Bhd (Co. No. 1074096-W)

OSD Design Group

PT Innovative Design (M) Sdn Bhd(Co. No. 1224078-U)

BR Innovative Design (M) Sdn Bhd (Co. No. 1267941-P)

OSD Design Group

OS Alliance Pte Ltd (Singapore Co. No. 201918419N)

Copyright © 2021 OSD DESIGN GROUP. All Rights Reserved