Sg Lebir Bridge, Aring, Terengganu: Precamber Design for Prestressed Box Girder Constructed by Balanced Cantilever Method
Carried out bridge stability check and pre-camber calculation for balanced cantilever construction.
Advised on the bridge construction sequence and setting survey reference points for box girder.
Design temporary work to stabilise the two cantilever tips forcasting of midspan and end span stitching segments