Sg. Padas Bridge,Beaufort Sabah :Box Girder Bridge by Balanced Cantilevered Method
Designed temporary fixity system using spun piles during construction stage because the bridge was designed on pot-bearing support which is not stable for cantilever construction.
Carried out bridge stability check and pre-camber calculation for balanced cantilever construction.
Design temporary work to stabilise the two cantilever tips for casting of midspan and endspan stitching segments.