Our Projects Our Project Reference

  • Proposed construction and completion of the Sarawak Coastal Road Package 04: Proposed construction and completion of Muara Lassa Bridge, Mukah Division

    Malaysia

    Proposed construction and completion of the Sarawak Coastal Road Package 04

    Malaysia | Completed

    Proposed construction and completion of the Sarawak Coastal Road Package 04: Proposed construction and completion of Muara Lassa Bridge, Mukah Division

    • Carried out design review on the design and detailing of the balanced cantilever box girder bridge pf multiple spans (main span of 200m) for total length of 2km.
  • Solstice@ Pan’gaea, Cyberjaya: Prestressed Transfer Plate for 2 Blocks of 36 and 40 Storey Condominium

    Malaysia

    Solstice@ Pan'gaea, Cyberjaya

    Malaysia | Completed

    Solstice@ Pan’gaea, Cyberjaya: Prestressed Transfer Plate for 2 Blocks of 36 and 40 Storey Condominium

    • Carried out independent Finite Element Modelling to check the design of prestressed transfer plate for two blocks of condominium with 36 storeys and 40storeys.
    • Commented and advised on the tendon and rebar detailing of the prestressed transfer plate.
  • Special Crossings for Ampang Line LRT Extension: Design Review of Precast Segmental Box Girder (SBG)

    Malaysia

    Special Crossings for Ampang Line LRT Extension

    Malaysia | Completed

    Special Crossings for Ampang Line LRT Extension: Design Review of Precast Segmental Box Girder (SBG)

    • Carried out design review on precast segmental box girder (SBG) for the special crossings.
  • MRT-V8 Special Crossing: Precast Segmental Box Girder Lifting/Stacking Points and Concrete Blister Design for Temporary Prestress during Erection

    Malaysia

    MRT-V8 Special Crossing

    Malaysia | Completed

    MRT-V8 Special Crossing: Precast Segmental Box Girder Lifting/Stacking Points and Concrete Blister Design for Temporary Prestress during Erection

    • Carried out design review on precast segmental box girder (SBG) lifting and stacking point
    • Carried out review on the design and detailing of the concrete blister for temporary prestress during segment erection.
  • Menjalara18 Residence Bandar Menjalara, Kuala Lumpur: Design Review on Prestressed Transfer Plate

    Malaysia

    Menjalara18 Residence Bandar Menjalara, Kuala Lumpur

    Malaysia | Completed

    Menjalara18 Residence Bandar Menjalara, Kuala Lumpur: Design Review on Prestressed Transfer Plate

    • Carried out independent Finite Element Modelling to check the design of prestressed transfer plate for three blocks of condominium of 18 to 20storeys.
    • Commented and advised on the tendon and rebar detailing of the prestressed transfer plate.
  • Service Apartment @ OUG Parklane, Kuala Lumpur: Prestressed Flat Slab and Prestressed Transfer Beams

    Malaysia

    Service Apartment @ OUG Parklane, Kuala Lumpur

    Malaysia | Completed

    Service Apartment @ OUG Parklane, Kuala Lumpur: Prestressed Flat Slab and Prestressed Transfer Beams

    • Carried out design check on the contractor’s proposed alternative design using prestressed flat slab.
    • Carried out design check on the prestressed transfer beams at the transfer floor level.
  • Sunway South Quay Residence: Design Review of Prestressed Transfer Structures on Alternative Design by Specialist Contractor

    Malaysia

    Sunway South Quay Residence

    Malaysia | Completed

    Sunway South Quay Residence: Design Review of Prestressed Transfer Structures on Alternative Design by Specialist Contractor

    • Carried out design check on the alternative prestressed transfer structures proposed by specialist contractor.
    • Advised and commented on the rebar detailing and construction sequence.
  • Sg.Jeram Bridge,Kuala Terengganu: Design Review of Balanced Cantilever Box Girder Supported on 6 nos of Pile-Bent Piers- 1200dia Bored Piles

    Malaysia

    Sg.Jeram Bridge,Kuala Terengganu

    Malaysia | Completed

    Sg.Jeram Bridge,Kuala Terengganu: Design Review of Balanced Cantilever Box Girder Supported on 6 nos of Pile-Bent Piers- 1200dia Bored Piles

    • Carried out bridge analysis and design check on the alternative design of box girder built by cast in-situ balanced cantilever method supported on pile-bent piers.
    • Advised and verified the proposed tendon detailing and arrangement for form traveler operation.
  • Bridge over Sg Segama,60/90/60m Pelaksanaan  Projek Lebuhraya Pan Borneo Sabah, Cadangan Menaiktaraf Jalan Dari Lahad Datu to Kg Sandau, Sabah

    Malaysia

    Bridge over Sg. Segama, 60/90/60m Pelaksanaan Projek Lebuhraya Pan Borneo Sabah, Cadangan Menaiktaraf Jalan Dari Lahad Datu to Kg. Sandau, Sabah

    Malaysia | Completed

    Bridge over Sg Segama,60/90/60m Pelaksanaan Projek Lebuhraya Pan Borneo Sabah, Cadangan Menaiktaraf Jalan Dari Lahad Datu to Kg Sandau, Sabah

    • Carry out design review for the box girder bridge structures constructed by Balanced Cantilever Construction Method on Form Traveler.
    • Carry out Finite Element modeling of the box girders for the detailed transverse analysis.
  • The Construction and Completion of Light Rail Transit Line 3 (LRT3) from Bandar Utama to Johan Setia

    Malaysia

    The Construction and Completion of Light Rail Transit Line 3 (LRT3) from Bandar Utama to Johan Setia

    Malaysia | Completed

    The Construction and Completion of Light Rail Transit Line 3 (LRT3) from Bandar Utama to Johan Setia

    • Carry out design review on the elevated guideway structures of the entire 10 work packages as independent checker.
    • Carry out design check on the U-Through  guideways   and the 16 nos of long span crossings.
    • Carry out design check on the precast piercast piercaps, columns and other substructures.