Our Projects Our Project Reference

  • Batu Maung Flyover: Bridge Connecting Penang Second Link to Batu Maung

    Malaysia

    Batu Maung Flyover

    Malaysia | Completed

    Batu Maung Flyover: Bridge Connecting Penang Second Link to Batu Maung

    • Analysed and designed of precast pretensioned U beam for semi-integral bridges, cantilever precast prestress segmental crosshead and all the superstructure and substructure elements.
    • Prepared Project Specifications for bridge structures and precast segmental crossheads.
  • Ecocity: Alternative Design using Precast T-Beams and Cast In-Situ Prestressed Spine Beams

    Malaysia

    Ecocity

    Malaysia | Completed

    Ecocity: Alternative Design using Precast T-Beams and Cast In-Situ Prestressed Spine Beams

    • Analysed and proposed alternative design of RC spine beam for integral bridges and precast beams for semi-integral bridges.
    • Proposed and designed foundation as single pile bend system.
  • Vehicular Bridge over Monsoon Drain for MRT Package 4 at Jalan Semantan: Alternative Design of RC Structures using Precast Beams and Half Slabs.

    Malaysia

    Vehicular Bridge over Monsoon Drain for MRT Package 4 at Jalan Semantan

    Malaysia | Completed

    Vehicular Bridge over Monsoon Drain for MRT Package 4 at Jalan Semantan: Alternative Design of RC Structures using Precast Beams and Half Slabs.

    • Carried out re-design of the cast in-situ RC structures to precast beams and half slabs to eliminate difficult falsework over monsoon drain.
    • Re-analysed and designed the bridge with pile-bent micropile pile support considering as-built pile eccentricity.
  • Dropped-In Precast T-Beams made Continuous with cast in-situ Hammerhead over Railway Track at Jalan Reko, Kajang

    Malaysia

    Dropped-In Precast T-Beams made Continuous with cast in-situ Hammerhead over Railway Track at Jalan Reko, Kajang

    Malaysia | Completed

    Dropped-In Precast T-Beams made Continuous with cast in-situ Hammerhead over Railway Track at Jalan Reko, Kajang

    • Propose alternative design from the previous cast in-situ box girder design to precast drop in span continuous T-beam system to facilitate the construction work.
  • Projek Mass Rapid Transit Laluan 2 – Jajaran Sg Buloh – Serdang – Putrajaya Package V201: Construction and Completion of Viaduct Guideway and Other Associated Works from Sg Buloh to Persiaran Dagang

    Malaysia

    Projek Mass Rapid Transit Laluan 2 – Jajaran Sg. Buloh – Serdang – Putrajaya Package V201: Construction and Completion of Viaduct Guideway and Other Associated Works from Sg. Buloh to Persiaran Dagang

    Malaysia | Completed

    Projek Mass Rapid Transit Laluan 2 – Jajaran Sg Buloh – Serdang – Putrajaya Package V201: Construction and Completion of Viaduct Guideway and Other Associated Works from Sg Buloh to Persiaran Dagang

    • Carry out Temporary and Permanent Works Checking including design of temporary support, etc., kinematic diagram and pre-camber calculation.
  • Projek Mass Rapid Transit Laluan 2 – Jajaran Sg. Buloh – Serdang – Putrajaya (SKSA Line)

    Malaysia

    Projek Mass Rapid Transit Laluan 2 – Jajaran Sg. Buloh – Serdang – Putrajaya (SKSA Line)

    Malaysia | Completed

    Projek Mass Rapid Transit Laluan 2 – Jajaran Sg. Buloh – Serdang – Putrajaya (SKSA Line)

    • Design for Long Span Crossings V204F, G, H and I V206E and Track Slabs/ Elevated U-Beams in V207
  • Entrance Bridge over the Lake leading to Sunway Serene Condominium Development Project, Kelana Jaya, Selangor

    Malaysia

    Entrance Bridge over the Lake leading to Sunway Serene Condominium Development Project, Kelana Jaya, Selangor

    Malaysia | Completed

    Entrance Bridge over the Lake leading to Sunway Serene Condominium Development Project, Kelana Jaya, Selangor

    • Carried out alternative design using cast in-situ beam and slab supported on spun piles for the access bridge over the lake
    • Designed the short driven spun piles with toe-pin for anchoring and lateral stability
    • Designed the temporary steel bridge to suit the span-by-span construction method for the construction and piling load
  • SKLIA: Balance Cantilever Cast In-Situ Box Girder Design

    Malaysia

    SKLIA: Balance Cantilever Cast In-Situ Box Girder Design

    Malaysia | Completed

    SKLIA: Balance Cantilever Cast In-Situ Box Girder Design

    • Analyze and design for the 70m-100m-70m span balance cantilever box girder.
    • Prepared Bill of Quantities and quantity taking off for cost estimation and ensure the construction cost is within the client expectation.
  • 50m Replacement Bridge at Rantau Silau, Negeri Sembilan: Design of Integral Bridge with Pile-Bent Abutment using Prestressed DURA Beam Panels

    Malaysia

    50m Replacement Bridge at Rantau Silau, Negeri Sembilan

    Malaysia | Completed

    50m Replacement Bridge at Rantau Silau, Negeri Sembilan: Design of Integral Bridge with Pile-Bent Abutment using Prestressed DURA Beam Panels

    • Design of integral bridge using post-tensioned precast DURA beams panel joined at site
    • Analysed and designed the bridge with pile-bent bored pile integral abutment.
  • Terengganu Istana Ramp, Kuala Terengganu: Design of Pile-Bent Integral Bridge with Multiple Span Reinforced Concrete RC Twin Rib Decks

    Malaysia

    Terengganu Istana Ramp, Kuala Terengganu

    Malaysia | Completed

    Terengganu Istana Ramp, Kuala Terengganu: Design of Pile-Bent Integral Bridge with Multiple Span Reinforced Concrete RC Twin Rib Decks

    • Proposed an alternative design for the semi-circular bridge with 45m radius on plan at steep hill slope.
    • Analysed and designed the bridge with pile-bent bored pile integral abutment.
  • Kerjaya Bridge Crossing over Sg. Melaka, Melaka City: Design of Steel Arch Bridge with Pipe Hangers and Pile-Bent RC Twin Rib Decks Approach Bridge

    Malaysia

    Kerjaya Bridge Crossing over Sg. Melaka, Melaka City

    Malaysia | Completed

    Kerjaya Bridge Crossing over Sg. Melaka, Melaka City: Design of Steel Arch Bridge with Pipe Hangers and Pile-Bent RC Twin Rib Decks Approach Bridge

    • Carried out road geometry and alignment design to match the level of the existing roads.
    • Analysed and designed the main span using Steel Arch and composite cross girder to increase the free board for tourist cruise boats.
    • Analysed and designed the approach spans using multiple scan of RC twin-rib deck.
  • Jeram Panjang Bridge, Rembau, Negeri Sembilan: Alternative Design of Pretensioned M-Beams based on the As-Built Piling Layout and Pier Position

    Malaysia

    Jeram Panjang Bridge, Rembau, Negeri Sembilan

    Malaysia | Completed

    Jeram Panjang Bridge, Rembau, Negeri Sembilan: Alternative Design of Pretensioned M-Beams based on the As-Built Piling Layout and Pier Position

    • Carried out bridge alignment design and precast beam layout to suit the as-built pier position.
    • Analysed and designed the pretensioned M-beams with varying length to suit the required span length based on as-built pier position.
  • Sunway Montana Suspension Bridge, Melawati, KL: Design of Pedestrian Suspension Bridge at Hill Slope

    Malaysia

    Sunway Montana Suspension Bridge, Melawati, KL

    Malaysia | Completed

    Sunway Montana Suspension Bridge, Melawati, KL: Design of Pedestrian Suspension Bridge at Hill Slope

    • Carried out bridge alignment design and feasibility study on bridge construction method.
    • Analysed and designed the bridge.
    • Compile drawings and Bill of Quantities for Project Costing
  • LRT Viaduct at Putra Height LRT Depot, Selangor: Alternative Design of LRT Viaduct from Single Span Prestressed Box Girder to Continuous RC Box Girder

    Malaysia

    LRT Viaduct at Putra Height LRT Depot, Selangor

    Malaysia | Completed

    LRT Viaduct at Putra Height LRT Depot, Selangor: Alternative Design of LRT Viaduct from Single Span Prestressed Box Girder to Continuous RC Box Girder

    • Analysed and designed the reinforced concrete box girders as 4-span continuous bridge.
    • Analysed and designed the slender piers as monolithic frames.
  • Cahaya SPK Dedicated Ramp, Shah Alam, Selangor: Design of 3-Span Integral Bridge by Precast Prestressed Box Beams made Monolithic with Bent Piers

    Malaysia

    Cahaya SPK Dedicated Ramp, Shah Alam, Selangor

    Malaysia | Completed

    Cahaya SPK Dedicated Ramp, Shah Alam, Selangor: Design of 3-Span Integral Bridge by Precast Prestressed Box Beams made Monolithic with Bent Piers

    • Analysed and designed the 3-span pile bent integral bridge built with precast box beams stitched to the cast in-situ hammerhead by continuity tendons.
    • Designed the temporary work for holding the precast box beams over highway during stitching using steel girders and prestress tie-down bars
    • Analysed and designed the approach spans using multiple span of 15m RC twin-rib bridge.
  • Approach Spans for Sitompok Bridge, Kuala Penyu, Sabah: Multiple Span Integral Bridge by Precast T-Beam 33m Made

    Malaysia

    Approach Spans for Sitompok Bridge, Kuala Penyu, Sabah

    Malaysia | Completed

    Approach Spans for Sitompok Bridge, Kuala Penyu, Sabah: Multiple Span Integral Bridge by Precast T-Beam 33m Made

    • Analysed and designed the integral the integral bridge as 4-span modules with piers.
    • Designed integral abutment for the bridge.
  • Sitompok Bridge, Kuala Penyu, Sabah: 5-Span Prestressed Box Girder Bridge by Cast In-Situ Balanced Cantilever Construction Method

    Malaysia

    Sitompok Bridge, Kuala Penyu, Sabah

    Malaysia | Completed

    Sitompok Bridge, Kuala Penyu, Sabah: 5-Span Prestressed Box Girder Bridge by Cast In-Situ Balanced Cantilever Construction Method

    • Analysed and designed the integral multiple continuous span box girder bridge.
    • Designed elevated pile cap with spun piles for vessel collision road.
  • Karamunsing Bridge, Sabah: Alternative Design of Precast Prestressed Rib Beams

    Malaysia

    Karamunsing Bridge, Sabah

    Malaysia | Completed

    Karamunsing Bridge, Sabah: Alternative Design of Precast Prestressed Rib Beams

    • Designed precast prestressed rib beams as alternative to the conforming steel girders.
    • Optimized beam depth to 700mm to allow higher free board.
  • USJ-KESAS Flyover, Selangor: RC Twin Rib Integral Bridge

    Malaysia

    USJ-KESAS Flyover, Selangor

    Malaysia | Completed

    USJ-KESAS Flyover, Selangor: RC Twin Rib Integral Bridge

    • Analysed and Designed RC full integral bridge with twin rib on pile bent foundations.
    • Designed abutment with monolithic connections and pile bent, 600dia spun piles.
  • Steel Arch Bridge of the Pulau Bunting Sea Crossing, Kedah

    Malaysia

    Steel Arch Bridge of the Pulau Bunting Sea Crossing, Kedah

    Malaysia | Completed

    Steel Arch Bridge of the Pulau Bunting Sea Crossing, Kedah

    • Designed of a 80m span basket handled bow- string steel arch with composite deck slab which involved off site fabrication & Assembly and lifted to position from barge
    • Designed bridge structures at various construction stages and advised on the construction method.
    • Designed and planned for the temporary structure and heavy lifting of the steel arch until lifted in position.