  • Animal Viaducts, Terengganu: Proposed Remedial Method for Under-Strengthen Bridge T-Beams

    Malaysia

    Animal Viaducts, Terengganu

    Malaysia | Completed

    Animal Viaducts, Terengganu: Proposed Remedial Method for Under-Strengthen Bridge T-Beams

    • Re-analyzed the bridge structures based on the actual modulus of elasticity of beam.
    • Proposed remedial method to strengthen the T-beams
  • Kingfisher Bridge Pile Cap Strengthening Design

    Malaysia

    Kingfisher Bridge Pile Cap Strengthening Design

    Malaysia | Completed

    Kingfisher Bridge Pile Cap Strengthening Design

    • Designed the pilecap enlargement and additional piling by micro piles to strengthening the damaged existing spun piled foundations.
    • Designed the temporary work to jack up the existing bridge for pot bearing replacement.
  • Structural Strengthening and Trimming of Reinforced Concrete Flat Slab for Institut Jantung Negara

    Malaysia

    Institut Jantung Negara

    Malaysia | Completed

    Structural Strengthening and Trimming of Reinforced Concrete Flat Slab for Institut Jantung Negara

    • Carried out structural analysis of RC flat slab for heavier loading from new medical equipment and design carbon fiber strengthening.
    • Designed structural trimming for RC flat slab with additional new opening to the existing structures.
  • Structural Strengthening to RHB Bank Jln Tun HS Lee Branch in KL

    Malaysia

    RHB Bank Jln Tun HS Lee Branch in KL

    Malaysia | Completed

    Structural Strengthening to RHB Bank Jln Tun HS Lee Branch in KL

    • Dimensional survey, visual Inspection and testing to the existing building structures.
    • Feasibility study to accommodate a new sprinkler tank within existing building.
    • Proposed structural strengthening work to the existing buildings.
    • Prepared specifications and bills of quantity for costing purpose.
  • Structural Strengthening Work at P1 South Travellator Lobby at Mid-Valley Mall

    Malaysia

    P1 South Travelator Lobby at Mid-Valley Mall

    Malaysia | Completed

    Structural Strengthening Work at P1 South Travellator Lobby at Mid-Valley Mall

    • Design the structural strengthening to Precast Hollow Core Slab using Carbon Fiber Plates.
  • VIVA Mall: Design Structural Strengthening for Prestressed Flat Slabs and Prestressed Beam-Slabs with Plate Bonding

    Malaysia

    VIVA Mall

    Malaysia | Completed

    VIVA Mall: Design Structural Strengthening for Prestressed Flat Slabs and Prestressed Beam-Slabs with Plate Bonding

    • Designed structural strengthening to the prestressed flat slabs using steel plate bonding from office to heavy retail load
    • Designed steel plate (shear plate) bonding for shear enhancement of prestressed beam.
  • Building Extension and Upgrading for TESCO Mutiara Damansara

    Malaysia

    TESCO Mutiara Damansara

    Malaysia | Completed

    Building Extension and Upgrading for TESCO Mutiara Damansara

    • Design the additional floor areas as Retail Areas.
    • Upgrade Car Park to Retail Areas at Ground Floor with under-pinning works.
    • Design structural strengthening to upgrade the existing car parks to Retail Areas by steel plate bonding.
    • Design the steel structures at the main façade of the Mall Entrance.
    • Design the additional car park and steel roof structures.
  • Structural Inspection and Assessment of Clover – Leaf Interchange for Lebuhraya Sambungan Putrajaya

    Malaysia

    Structural Inspection and Assessment of Clover - Leaf Interchange for Lebuhraya Sambungan Putrajaya

    Malaysia | Completed

    Structural Inspection and Assessment of Clover – Leaf Interchange for Lebuhraya Sambungan Putrajaya

    • Carried out testing and structural assessment to the clover-leaf interchange bridge in Putrajaya after the collapse of the adjacent bridge.
    • Carried out inspection of the current to condition of the bridge and recommend subsequent course of action.
  • Structural Inspection and Assessment of Kota   Kinabalu Port, Sabah

    Malaysia

    Structural Inspection and Assessment of Kota Kinabalu Port, Sabah

    Malaysia | Completed

    Structural Inspection and Assessment of Kota Kinabalu Port, Sabah

    • Visual Inspection and structural assessment to the main wharf structures, access bridge A&B, South Jetty and Fast-Erect Jetty.
    • Proposed structural retrofitting work and prepare bills of quantity for costing purpose.
  • Structural Appraisal to 7-Storey Corporate Office at Teluk Ramunia, Johor

    Malaysia

    Structural Appraisal to 7-Storey Corporate Office at Teluk Ramunia, Johor

    Malaysia | Completed

    Structural Appraisal to 7-Storey Corporate Office at Teluk Ramunia, Johor

    • Structural Assessment, Inspection and testing to the existing building structures.
    • Carried out comprehensive design check on the existing structural for the required design load.
    • Prepared an assessment report to the client to advise him on the current condition of the building before purchase.
  • Structural Assessment to RHB Bank Limbang Branch and Seremban Branch

    Malaysia

    Structural Assessment to RHB Bank Limbang Branch and Seremban Branch

    Malaysia | Completed

    Structural Assessment to RHB Bank Limbang Branch and Seremban Branch

    • Dimensional survey, visual Inspection and testing to the existing building structures.
    • Proposed structural retrofitting work to the existing buildings.
  • Visual Inspection and Assessment of Genting Highlands Buildings

    Malaysia

    Visual Inspection and Assessment of Genting Highlands Buildings

    Malaysia | Completed

    Visual Inspection and Assessment of Genting Highlands Buildings

    • Visual Inspection and structural assessment to Genting Hotel, Resort Hotel, Theme Park Hotel and Staff Quarters
    • Prepared inspection and assessment report for submission to local council.
  • Visual Inspection and Assessment of 3 Bridges in Keningau Town, Sabah

    Malaysia

    Visual Inspection and Assessment of 3 Bridges in Keningau Town, Sabah

    Malaysia | Completed

    Visual Inspection and Assessment of 3 Bridges in Keningau Town, Sabah

    • Carried out visual inspection and assessment on the current condition of the 3 concrete bridges in Keningau Town.
  • Load Carrying Capacity Check to Jana Manjung TNB Jetty & Access Bridge A32

    Malaysia

    Load Carrying Capacity Check to Jana Manjung TNB Jetty and Access Bridge A32

    Malaysia | Completed

    Load Carrying Capacity Check to Jana Manjung TNB Jetty & Access Bridge A32

    • Carried out modelling & structural analysis of the jetty structures for 430ton Generator and 185ton Girders.
    • Carried out bridge modelling & structural analysis of the Access Bridge A32 structures for 430ton Generator and 185ton Girders.
  • Structural Assessment to RHB Bank Sibu Branch and Section 14, PJ Branch

    Malaysia

    Structural Assessment to RHB Bank Sibu Branch and Section 14, PJ Branch

    Malaysia | Completed

    Structural Assessment to RHB Bank Sibu Branch and Section 14, PJ Branch

    • Dimensional survey, visual Inspection and testing to the existing building structures.
    • Analysis of the building structures for heavier load.
  • Load Carrying Capacity Check to 5 Bridges for 210ton Trailers

    Malaysia

    Load Carrying Capacity Check to 5 Bridges for 210-tonne Trailers

    Malaysia | Completed

    Load Carrying Capacity Check to 5 Bridges for 210ton Trailers

    • Dimensioning Survey and bridge visual inspection on 5 bridges along Kuala Selangor- Manjung Road at Tanjung Karang, Sabak Bernam, Hutan Melintang, Kuala Selangor and Manjung Jana Manjung Power Plant Link Bridge.
    • Bridge modelling & structural analysis of the bridge structures for 210ton trailer cargo load.
  • Load Carrying Capacity Check to Tg Bin Power Plant Main Jetty, Access Bridges, Retaining Walls and Ground Settlement Analysis for Access Roads

    Malaysia

    Load Carrying Capacity Check to Tg Bin Power Plant Main Jetty, Access Bridges, Retaining Walls and Ground Settlement Analysis for Access Roads

    Malaysia | Completed

    Load Carrying Capacity Check to Tg Bin Power Plant Main Jetty, Access Bridges, Retaining Walls and Ground Settlement Analysis for Access Roads

    • Carried out modelling & structural analysis of the Main Jetty structures for430ton Generator, 255ton Transformer, and 185ton Girders and other cargos.
    • Carried out bridge modelling & structural analysis of the Jetty Access Bridge and three CCW pipe protection bridges for the same types of cargo.
    • Carried out design check for the Retaining Walls along the proposed transport route for the same types of cargo
    • Carried out ground settlement analysis along the proposed transport route for the same types of cargo due to soft soil condition at site.
  • RHB: Building Inspection and Assessment

    Malaysia

    RHB

    Malaysia | Completed

    RHB: Building Inspection and Assessment

    • Slope failure assessment with rectification proposal for RHB Penn Cottage, Fraser Hill.
    • Building assessment or inspection with rectification proposal for RHB Batu Pahat.
    • Building assessment or inspection with rectification proposal for RHB Jelutong.
    • Building assessment or inspection with rectification and strengthening works proposal for RHB Sg. Siput.
  • Damansara–Shah Alam Elevated Expressway (DASH) CA4 Pier

    Malaysia

    Damansara – Shah Alam Elevated Expressway (DASH) CA4 Pier

    Malaysia | Completed

    Damansara–Shah Alam Elevated Expressway (DASH) CA4 Pier

    • Study of beam toppling incident during construction including preparing assessment report.
    • Study of Pier Cracks Incident during construction including preparing assessment report.
  • Batang Sadong Bridge, Sebuyau-Sadong Jaya, Sarawak: Precamber Design for Prestressed Box Girder Constructed by Balanced Cantilever Method

    Malaysia

    Batang Sadong Bridge, Sebuyau-Sadong Jaya, Sarawak

    Malaysia | Completed

    Batang Sadong Bridge, Sebuyau-Sadong Jaya, Sarawak: Precamber Design for Prestressed Box Girder Constructed by Balanced Cantilever Method

    • Longest Bridge in Malaysia with 10 spans of maximum span length up to 200m.
    • Carried out bridge stability check and pre-camber calculation for balanced cantilever construction.