Home
About Us
Company Background
Professional Team
Corporate Structure
Group Organisation Chart
Clients & Strategic Partners
Our expertise
Our Projects
Gallery
Seminar
Company Events
Contact Us
Our Projects
Our Project Reference
All Services
Bridge Design/ Alternative Design
Building Design/ Alternative Design
Construction Engineering Service & Temporary Work Design
Engineering Assessment & Structural Inspection
Structural Strengthening and upgrading work
3rd Party Design Review and Checking
All Services
Malaysia
Jeram Panjang Bridge, Rembau, Negeri Sembilan
Malaysia | Completed
Jeram Panjang Bridge, Rembau, Negeri Sembilan: Alternative Design of Pretensioned M-Beams based on the As-Built Piling Layout and Pier Position
Carried out bridge alignment design and precast beam layout to suit the as-built pier position.
Analysed and designed the pretensioned M-beams with varying length to suit the required span length based on as-built pier position.
Malaysia
Sunway Montana Suspension Bridge, Melawati, KL
Malaysia | Completed
Sunway Montana Suspension Bridge, Melawati, KL: Design of Pedestrian Suspension Bridge at Hill Slope
Carried out bridge alignment design and feasibility study on bridge construction method.
Analysed and designed the bridge.
Compile drawings and Bill of Quantities for Project Costing
Malaysia
LRT Viaduct at Putra Height LRT Depot, Selangor
Malaysia | Completed
LRT Viaduct at Putra Height LRT Depot, Selangor: Alternative Design of LRT Viaduct from Single Span Prestressed Box Girder to Continuous RC Box Girder
Analysed and designed the reinforced concrete box girders as 4-span continuous bridge.
Analysed and designed the slender piers as monolithic frames.
Malaysia
Cahaya SPK Dedicated Ramp, Shah Alam, Selangor
Malaysia | Completed
Cahaya SPK Dedicated Ramp, Shah Alam, Selangor: Design of 3-Span Integral Bridge by Precast Prestressed Box Beams made Monolithic with Bent Piers
Analysed and designed the 3-span pile bent integral bridge built with precast box beams stitched to the cast in-situ hammerhead by continuity tendons.
Designed the temporary work for holding the precast box beams over highway during stitching using steel girders and prestress tie-down bars
Analysed and designed the approach spans using multiple span of 15m RC twin-rib bridge.
Malaysia
Approach Spans for Sitompok Bridge, Kuala Penyu, Sabah
Malaysia | Completed
Approach Spans for Sitompok Bridge, Kuala Penyu, Sabah: Multiple Span Integral Bridge by Precast T-Beam 33m Made
Analysed and designed the integral the integral bridge as 4-span modules with piers.
Designed integral abutment for the bridge.
Malaysia
Sitompok Bridge, Kuala Penyu, Sabah
Malaysia | Completed
Sitompok Bridge, Kuala Penyu, Sabah: 5-Span Prestressed Box Girder Bridge by Cast In-Situ Balanced Cantilever Construction Method
Analysed and designed the integral multiple continuous span box girder bridge.
Designed elevated pile cap with spun piles for vessel collision road.
Malaysia
Karamunsing Bridge, Sabah
Malaysia | Completed
Karamunsing Bridge, Sabah: Alternative Design of Precast Prestressed Rib Beams
Designed precast prestressed rib beams as alternative to the conforming steel girders.
Optimized beam depth to 700mm to allow higher free board.
Malaysia
USJ-KESAS Flyover, Selangor
Malaysia | Completed
USJ-KESAS Flyover, Selangor: RC Twin Rib Integral Bridge
Analysed and Designed RC full integral bridge with twin rib on pile bent foundations.
Designed abutment with monolithic connections and pile bent, 600dia spun piles.
Malaysia
Steel Arch Bridge of the Pulau Bunting Sea Crossing, Kedah
Malaysia | Completed
Steel Arch Bridge of the Pulau Bunting Sea Crossing, Kedah
Designed of a 80m span basket handled bow- string steel arch with composite deck slab which involved off site fabrication & Assembly and lifted to position from barge
Designed bridge structures at various construction stages and advised on the construction method.
Designed and planned for the temporary structure and heavy lifting of the steel arch until lifted in position.
Malaysia
Juru Ramp Bridge, Penang
Malaysia | Completed
Juru Ramp Bridge, Penang: Precast Box Beam made Monolithic with Piers
Alternative design of the bridge to adopt precast box beams and made monolithic with piers.
To extend the span lengths, prestressed hammerheads are casted first and later precast beams are dropped in for stitching as monolithic structure.
Malaysia
Bridge over Sungai Sebelak, Roban, Sarawak
Malaysia | Completed
Bridge over Sungai Sebelak, Roban, Sarawak: Cast In-Situ Prestressed Box Girder (65/120/65m) built by Cantilever Construction with Anchor Span on Falsework
Carried out alternative design of the prestressed segmental box girder using cantilever construction method with cast in-situ anchor spans
Design of Temporary Fixity System and carry out Construction Stage Stability Analysis
Designed the falsework for the cast in-situ anchor spans and box girder stitching segment.
Malaysia
Suspension Bridge, Broga, Selangor
Malaysia | Completed
Suspension Bridge, Broga, Selangor: Pedestrian Bridge with Main Span 68m
Analysed and designed the suspension bridge as flexible deck structure.
Designed the 30m pylon, foundation with micro piles and wire rope anchoring system at abutments.
Malaysia
Iconic Pedestrian Bridge, Terengganu
Malaysia | Completed
Iconic Pedestrian Bridge, Terengganu: Design of Single plan Steel Arch with Truss Deck of Curve Length 45m
Designed the single-plane steel arch as a fixed arch to support the curve deck using cable hanger system
Provided technical support and construction engineering service to the contractor including the precamber analysis, cable force tuning and stability check of the structure during the erection stages.
Design the foundations as fixed-arch integral bridge using micropile as both tension and compression piles.
Malaysia
Pulau Sekati Bridge at Lusong-Teluk Pasu, Terengganu
Malaysia | Completed
Pulau Sekati Bridge at Lusong-Teluk Pasu, Terengganu: Alternative Design of 3-Span Prestressed Box Girder Balanced Cantilever Bridge
Carried out design optimization on the cast in-situ prestressed box girder bridge with span length of 85/120/85m built on form travelers using the balanced cantilever construction method.
Designed the elevated pile cap supported on spun piles for high vessel collision load and monolithic piers.
Malaysia
Tasek Kenyir Bridge, Terengganu
Malaysia | Completed
Tasek Kenyir Bridge, Terengganu: Alternative Design of Prestressed Balanced Cantilever Box Girder Bridge with Main Span 100m and side span 70m
Carried out design optimization on the balanced cantilever box girder bridge.
Carried out pre-camber analysis and prepared the pre-camber chart.
Analysed and designed the temporary work for closure pour segments at midspan & end spans.
Malaysia
Ampang- Kuala Lumpur Elevated Highway Eastbound km 4.6 - km 6.0 (AKLEH) Phase 2
Malaysia | Completed
Ampang- Kuala Lumpur Elevated Highway East Bound km 4.6 – km 6.0 (AKLEH) Phase 2
Carried out Alternative Design to the bridge structures from the foundation to superstructures of the 1.4km Elevated Viaduct.
Designed the Elevated viaducts with precast pretensioned and post-tensioned beams supported on pile-bent system.
Carried out design check and advised the contractor to solve various site and construction problems.
Malaysia
Cadangan Perlaksanaan Bagi Pembinaan Flyover dan Terowong Di Pembangunan Taman LTAT 2 dan LTAT 3, Bukit Jalil, Mukim Petaling, Wilayah Persekutuan, Kuala Lumpur
Malaysia | Completed
Cadangan Perlaksanaan Bagi Pembinaan Flyover & Terowong Di Pembangunan Taman LTAT 2 dan LTAT 3, Bukit Jalil, Mukim Petaling, Wilayah Persekutuan, Kuala Lumpur
Carry out alternative design of the main crossings, elevated in-ramps and out-ramps from Jalan Bukit Jalil into Taman LTAT2
Designed the bridge structures of the directional ramps with Cast in-situ RC twin ribs and RC spine beams
Carried out alternative design of the crossing with multiple spans of cast in- situ prestressed box girders consisted of a combination of 4-span module (46/62.5/62.5/46m) and 2-span module (50m/50m)
Malaysia
Menaiktaraf Jalan Ayer Keroh Ke Bandar Melaka [Fasa 1: Pembinaaan Persimpangan Peringgit Dan Persimpangan MITC Interchange No.7]
Malaysia | Completed
Menaiktaraf Jalan Ayer Keroh Ke Bandar Melaka [Fasa 1: Pembinaaan Persimpangan Peringgit Dan Persimpangan MITC Interchange No.7]
Carried out alternative Design of the bridge using cast in-situ Segmental Box Girder by Balanced Cantilever Construction method.
Designed the monolith cantilever crosshead to support the 120m main spans box girder bridge to avoid numerous traffic obstruction during construction over a busy traffic junction.
Reviewed and approved the contractor’s proposal and submissions of the temporary work and construction methods.
Malaysia
Privatisation of Lebuhraya Pesisiran Pantai Barat (Taiping-Banting) KAPAR Interchange - ASSAM JAWA Interchange (Section 6)
Malaysia | Completed
Privatisation of Lebuhraya Pesisiran Pantai Barat (Taiping-Banting) KAPAR Interchange- ASSAM JAWA Interchange (Section 6)
Carried out alternative design of the 9 elevated viaducts and bridge structures
Review the contractor’s submissions and provide technical support to contractor during bridge constructions
Prepared Bill of Quantities and quantity taking off for contractor’s costing and calling for sub-con tender.
Malaysia
Cadangan Pelan Jalan Dan Perparitan Bagi Cadangan Membina Jejambat Fasa-1 ke 3 Atas Rezab Jalan Dataran Bandar Utama Yang Menghubungi Projek Pembangunan PT 37650 Ke Dataran Bandar Utama, PJU 6, Petaling Jaya Untuk Tetuan Bandar Utama City Assets Sdn Bhd
Malaysia | Completed
Cadangan Pelan Jalan Dan Perparitan Bagi Cadangan Membina Jejambat Fasa-1 ke 3 Atas Rezab Jalan Dataran Bandar Utama Yang Menghubungi Projek Pembangunan PT 37650 Ke Dataran Bandar Utama, PJU 6, Petaling Jaya Untuk Tetuan Bandar Utama City Assets Sdn Bhd
Designed the bridge of complicated alignment and profiles using precast modified U & T-beam superstructure to reduce the span numbers and foundation works.
Designed the bridge foundation as large diameter mono-pile bent system to avoid traffic obstruction, including the design of eccentric L-shape crossheads.
Prepared Bill of Quantities and quantity taking off for cost estimation and ensure the construction cost is within client
Page 5 of 6
« First
«
...
2
3
4
5
6
»